系统集成项目管理工程师计算类试题真题详解 epub pdf mobi txt 电子书 下载 2024
发表于2024-11-22
系统集成项目管理工程师计算类试题真题详解 epub pdf mobi txt 电子书 下载 2024
系统集成项目管理工程师考试是全国计算机技术与软件专业资格(水平)考试的中级职称考试,也是企业评定系统集成资质必需的证书,是历年软考报名中的热点。
系统集成项目管理工程师考试中涉及大量的计算题,是考试的重点也是众多考生的噩梦和难以克服的难点,尤其是下午案例分析中的进度和成本计算题,在软考必须一次考试通过全部科目的背景下,计算题的对错将决定考试成败。
全面覆盖了自2009年上半年至2015年下半年共14次考试中的全部计算类试题。
书中系统、详细地解析了这些复杂计算题,详细到每个步骤,同时配有考点回顾和计算公式等相关内容,一切为了考生和读者能够真正吃透计算题。
考生读懂本书后,可以透彻地掌握考试涉及的所有计算类考点,并能清晰理解考试的命题规律与命题思路,可以大幅提高考试的通过率。
系统集成项目管理工程师考试是全国计算机技术与软件专业资格(水平)考试的中级职称考试,也是企业评定系统集成资质所必需的证书,是历年软考报名中的热点。
古人云,得中原者得天下;现下有,得计算题者得软考。系统集成项目管理工程师考试中涉及大量的计算题,是考试的重点也是众多考生难以克服的难点,尤其是下午案例分析中的进度和成本计算题,在软考必须一次考试通过全部科目的背景下,其重要性可以称之为“一题做错,考试全砸!”。
本书全面覆盖了自2009年上半年至2015年下半年共14次考试中的全部计算类试题(包括上午选择题和下午案例题),系统、详细地逐题解析了这些复杂计算题,并配有考点回顾和计算公式,一切为考生和读者能够真正吃透计算题服务。
参加考试的考生,认真读懂本书的内容后,可以透彻地掌握考试涉及的所有计算类考点,可以清晰理解考试的命题规律、命题思路,可以大幅提高考试的通过率。
第1章 进度管理计算题 ······································································1
1.1 单代号网络图 ················································································1
1.1.1 知识点回顾 ·····················································································1
1.1.2 历年试题解析 ··················································································2
1.2 双代号网络图 ················································································4
1.2.1 知识点回顾 ·····················································································4
1.2.2 历年试题解析 ··················································································5
1.3 关键路径法 ···················································································6
1.3.1 知识点回顾 ·····················································································6
1.3.2 历年试题解析 ··················································································8
1.4 进度压缩 ·····················································································14
1.4.1 知识点回顾 ···················································································14
1.4.2 历年试题解析 ················································································14
1.5 资源优化 ·····················································································18
1.5.1 知识点回顾 ···················································································18
1.5.2 历年试题解析 ················································································19
1.6 PERT估算 ···················································································22
1.6.1 知识点回顾 ···················································································22
1.6.2 历年试题解析 ················································································23
1.7 进度估算 ·····················································································28
1.7.1 知识点回顾 ···················································································28
1.7.2 历年试题解析 ················································································28
1.8 进度综合案例 ···············································································33
1.8.1 (2009上半年,下午)试题二···························································33
1.8.2 (2011下半年,下午)试题二 ···························································35
1.8.3 (2013上半年,下午)试题二···························································37
·VI·
第2章成本管理计算题 ···································································· 40
2.1 成本类型 ·····················································································40
2.1.1 知识点回顾 ··················································································· 40
2.1.2 历年试题解析 ················································································ 40
2.2 成本估算 ·····················································································45
2.2.1 知识点回顾 ··················································································· 45
2.2.2 历年试题解析 ················································································ 46
2.3 成本预算 ·····················································································50
2.3.1 知识点回顾 ··················································································· 50
2.3.2 历年试题解析 ················································································ 51
2.4 挣值管理 ·····················································································55
2.4.1 知识点回顾 ··················································································· 55
2.4.2 历年试题解析 ················································································ 59
2.5 成本预测 ·····················································································68
2.5.1 知识点回顾 ··················································································· 68
2.5.2 历年试题解析 ················································································ 69
2.6 成本综合案例 ···············································································72
2.6.1 (2009下半年,下午)试题四··························································· 73
2.6.2 (2010上半年,下午)试题二··························································· 74
2.6.3 (2010下半年,下午)试题二 ·························································· 75
2.6.4 (2011 上半年,下午)试题二 ··························································· 77
2.6.5 (2012下半年,下午)试题三··························································· 79
2.6.6 (2013下半年,下午)试题四··························································· 85
2.6.7 (2014上半年,下午)试题四··························································· 87
第3章进度成本综合案例题 ······························································ 89
3.1 (2012上半年,下午)试题二 ··························································89
3.2 (2014下半年,下午)试题一 ··························································92
3.3 (2015上半年,下午)试题一 ··························································94
3.4 (2015下半年,下午)试题四 ··························································98
·VII·
第4章风险管理计算题 ···································································103
第5章招标采购计算题 ···································································108
5.1 历年试题解析 ············································································· 108
5.2 综合案例 ··················································································· 120
5.2.1 (2009下半年,下午)试题一··························································120
5.2.2 (2013下半年,下午)试题二··························································122
5.2.3 (2015下半年,下午)试题一··························································123
第6章立项管理计算题 ···································································125
第7章信息技术计算题 ···································································129
第8章集成资质计算题 ···································································139
系统集成项目管理工程师计算类试题真题详解 epub pdf mobi txt 电子书 下载 2024
系统集成项目管理工程师计算类试题真题详解 下载 epub mobi pdf txt 电子书 2024系统集成项目管理工程师计算类试题真题详解 mobi pdf epub txt 电子书 下载 2024
系统集成项目管理工程师计算类试题真题详解 epub pdf mobi txt 电子书 下载经常京东网购,总有大量的包裹收,感觉写评语花掉了我大量的时间和精力! 所以在一段时间里,我总是不去评价 或者随便写写! 但是,我又总是觉得好像有点对不住那些辛苦工作的卖家客服、仓管、老板。 于是我写下了一小段话,给我觉得能拿到我五星好评的卖家的宝贝评价里面以示感谢和尊敬! 首先,宝贝是 性价比很高的,我每次都会先试用再评价的,虽然宝贝不一定是最好的,但在同等的价位里面绝对是表现最棒的。 京东的配送绝对是一流的,送货速度快,配送员服务态度好,每样东西都是送货上门。 希望京东能再接再厉, 做得更大更强。
评分为什么我喜欢在京东买东西,因为今天买明天就可以送到。我为什么每个商品的评价都一样,因为在京东买的东西太多太多了,导致积累了很多未评价的订单,所以我统一用这段话作为评价内容。
评分系统集成项目管理工程师历年真题解析
评分书的质量价格送货速度相当棒,超赞,一下买了四本,同事们看到都说是正品
评分正版,就是京东价格不稳定,一会80多,一会65,差价太大
评分是正版的,就一本书,没有赠送电子资料什么的,那就看书吧
评分资料不错,基本上书都在京东上买了,价格也还可以。
评分备战11月份的考试。四本书外,有一张1200元减200元的视频讲解学习卡。
评分考试考试加工资加工资 同事一起买了好多 要努力咯!
系统集成项目管理工程师计算类试题真题详解 epub pdf mobi txt 电子书 下载 2024